Valley Clubhouse Update February 25, 2014

 Progress continues at the Valley. The picture on the left is the view of the club house coming up the entrance lane way.
 This picture shows the walls being covered up with OSB Board.






This picture shows the OSB board being covered up with an insulating material called DenseGlass Sheathing. Also shown in this picture is the roofing company which started yesterday. Until next time... David  

Friday, 14 February 2014

Valley Clubhouse update Feb 14, 2014


 

 The contractors have been busy framing the walls, roof deck and the peaks. You will see by the pictures the building is starting to take shape. All the roof peaks were framed on the ground and hoisted in place with a large fork lift. Enjoy the pictures. Until next time...
David


Saturday, 1 February 2014

Valley Clubhouse Update Feb 1st 2014

 Ted DeCorso came home from the sunny south to inspect the progress of the new clubhouse. Although the freezing cold temperatures were a shock to his system he is please with what he sees. The cold weather has slowed down the construction however they had a good two weeks.
The building is starting to take shape. The metal columns and beams were installed last week and wood framing started this week. Back filling around the foundation continues at a slow place. The fill has to be placed in intervals and compacted to prevent future settling. Back filling with frost chunks or frozen soil in not permitted. This has been a challenge with such cold temperatures because the frost keeps reforming.
Until next time... David


Tuesday, 14 January 2014

Valley Clubhouse Update January 14, 2014

Pouring the Retaining Wall on the North Side
North End Retaining wall was poured last week.  Today the precast concrete floor was delivered and installed. Quite a process.  Enjoy the pictures!
Pouring Retaining Wall North Side 




Installing Precast Concrete Floor
Floor Slab Being Placed

Friday, 13 December 2013

Valley Clubhouse Update - December 13, 2013

Retaining wall being formed on
South side
 
 Most of the Foundation Walls were poured this week for the clubhouse. They have to still pour Foundation Walls for retaining walls and the one end of the club house. This process has been much slower than anticipated. The weather this week definitely slowed the contractor down. Hopefully they will be able to make up some time before the real freeze! The goal next week is to pour the retaining wall foundations and start back filling before Christmas.   Until next time....  David






View from the North side

Friday, 22 November 2013

Valley Clubhouse Construction Update

 The footings for the foundation walls were poured today. There was quite a lot of digging required. The footings are quite large on this project because there are a few retaining walls which require sufficient stabilization.  As you can see they had to use a pumper truck for the cement. It is good to see the progress.
Until next time.... David

Thursday, 7 November 2013

Clubhouse Construction Has Begun

 Excavation for the New Clubhouse has begun this week. The contractor hopes to have the footing and foundation poured sometime next week. There is a substantial amount of fill to move around and the site is quite tight.  I will keep you posted as the project progresses.
Until next time...
David